With the project documentation (
and
), utilize the risk management process and the below template to create a risk register of at least 10 risk events for the project. After identifying the risks, conduct analysis to determine the top three risks on the project, and recommend response options for these three risks. If you have any questions or comments, please contact the course director.
Step 1- Identify and record risk events for the renovation project (minimum 10 risk events).
Step 2- Conduct analysis on each risk event to determine the probability of occurrence and the impact of occurrence.
Step 3- Using the results of the analysis, determine the top 3 risk events facing the project.
Step 4- Recommend a course of action for each of the top 3 risk events, and describe the results of that action (both the cost of taking the action, and the expected result to the project risk event of taking that action).
Risk Register Grading Rubric (1)
Risk Register Grading Rubric (1)
CriteriaRatingsPtsThis criterion is linked to a Learning Outcome
Student Submitted 10 risk events (6 points each)
60 pts
Full Marks
10 risk events submitted
0 pts
No Marks
Less than 10 risk events submitted
60 pts
This criterion is linked to a Learning Outcome
Student recommended response options for the top 3 risks (10 points each)
40 pts
Full Marks
Recommendations for all 3 top risks
0 pts
No Marks
Less than all 3 top risk recommendations
40 pts
Total Points: 100
Attached Files (PDF/DOCX): work sheet.pdf, Drawings.pdf
Note: Content extraction from these files is restricted, please review them manually.

Leave a Reply
You must be logged in to post a comment.