For this assignment, you will prepare a construction schedule (network logic diagram) using the attached Excel spreadsheet. Upload your completed schedule using the assignment link above. *Refer back to the videos provided in the Module 3 lesson which will walk you through the process of calculating the network elements.
Instructions:
- See the construction schedule (network logic diagram) on the attached spreadsheet “Construction Scheduling Assignment.”
- For each part of the network provided, please calculate the following and place the correct figure in the appropriate box (see the network “Key” on the diagram):
- Early Start
- Early Finish
- Late Start
- Late Finish
- Total Float
- Below the diagram (in the space provided on the spreadsheet), please indicate the:
- Minimum overall project duration
- Critical path
Requirements: as specified