FOR CONSTRCTION PURPOSE ONLY.
i need to create three logistics plan for 3 floors of the library and one overall one.
My CSI codes are MEPS. i Will provide the schedule and plans. name your price.
you must show:
Crane or material lift location
Dumpster location
Laydown yard
Material delivery route
Worker parking
Site fencing
Temporary office trailer
Main material staging
ork zones (HVAC first, then plumbing, then electrical)
Material staging corner
Equipment (scissor lift, carts)
Clear walking path
Safety exit path
Temporary power
Attached Files (PDF/DOCX): Mechanical.pdf, SNHU Library – Plumbing Drawings.pdf, SNHU Library – Fire Protection Drawings.pdf, SNHU Library – Electrical Drawings (1).pdf, Team 1 SNHU Library – Baseline Schedule – V9 (1).pdf
Note: Content extraction from these files is restricted, please review them manually.