Scheduling, Site Logistics & Safety Planning Homework Assignment 3: Project Schedule + Site Logistics & Safety Plan Goal: Demonstrate ability to plan and control project execution through scheduling and field planning. Project Deliverables (2-5 pages + attachments): Construction Schedule Minimum 15 activities Include: milestones, critical path, procurement lead times Provide either: Microsoft Project file + exported Gantt chart OR Equivalent professional scheduling format Site Logistics Plan Site layout diagram with: Crane/hoist zones (if applicable) Material staging Traffic flow & delivery routes Worker parking Fencing and access control Safety Plan Snapshot Identify 5 major hazards, cite OSHA Standard(s) Provide controls for each hazard Include OSHA and site-specific practices Submission Format: PDF schedule report, Gantt chart , site logistics drawing (can be hand-drawn and scanned, or downloaded from internet) Builds toward final portfolio by adding execution strategy and field planning. use files attached
Attached Files (PDF/DOCX): Scheduling Site Logistics Safety Planning.pdf, Narrative Capstone Project.pdf, Proposal Week 1.docx
Note: Content extraction from these files is restricted, please review them manually.

Leave a Reply
You must be logged in to post a comment.